Having a sound small business credit score, outstanding after-sales services and modern manufacturing facilities, we've got earned an fantastic reputation among our buyers across the globe for Metal Wall Above Ground Pool, Outdoor Solar Shower Reviews, Pool Sun Heater, We're going to endeavor to maintain our fantastic track record as the very best products supplier in the planet. When you've got any questions or reviews, you should get in touch with with us freely.
Short Lead Time for Solar Pro Pool Heater - STARMATRIX Steel Structure Hard Side Pool – STARMATRIX Detail:
PREMIUM POOL
STARMATRIX Steel Structure Hard Side Pool
Short Description
Short Description
• 29 MM width strong and stability top & bottom rails
• Pre-cut for in-wall skimmer and inlet&outlet
• Each pool loading on one mini pallet
• Optional equipment: filtration kit, solar/winter cover
1.2
M
0.4 MM standard hot dipped galvanized corrugated wall
0.4 MM UV resistant PVC liner
0.6 MM standard hot dipped galvanized top platform and vertical support
3 steps A frame security ladder
1.3
M
0.4 MM standard hot dipped galvanized corrugated wall
0.4 MM UV resistant PVC liner
0.6 MM standard hot dipped galvanized top platform and vertical support
4 steps A frame security ladder
|
SP3012B/BW |
SP3612B/BW |
SP4612B/BW |
SP5512B/BW |
SP6412B/BW |
SP7312B/BW |
|
Φ3.00×1.2 |
Φ3.60×1.2 |
Φ4.60×1.2 |
Φ5.50×1.2 |
Φ6.40×1.2 |
Φ7.30×1.2 |
|
7420 L |
10680 L |
17450 L |
24900 L |
33780 L |
43950 L |
|
100 |
113 |
140 |
165 |
183 |
210 |
|
56x40x144.5 |
56x40x144.5 |
58x40x148 |
60x40x156 |
65x50x156 |
65x53x160 |
|
√ |
√ |
√ |
√ |
√ |
√ |
|
√ |
√ |
√ |
√ |
√ |
√ |
|
√ |
√ |
√ |
√ |
√ |
√ |
83,000㎡
Covers an area of 8,3000㎡
80,000㎡
Workshop area of 80000㎡
12
12 assembly lines
300
Over 300 engineers and workers
83,000㎡
Covers an area of 8,3000㎡
80,000㎡
Workshop area of 80000㎡
12
12 assembly lines
300
Over 300 engineers and workers
Product Category
Steel Wall Pool
Pool Filter
Pool Pump
Solar Heater
Solar Shower
Accessories
Product detail pictures:
Related Product Guide:
It can be our accountability to satisfy your preferences and competently provide you. Your satisfaction is our greatest reward. We are searching ahead towards your visit for joint growth for Short Lead Time for Solar Pro Pool Heater - STARMATRIX Steel Structure Hard Side Pool – STARMATRIX , The product will supply to all over the world, such as: Belize, Albania, Austria, We've established long-term, stable and good business relationships with many manufacturers and wholesalers around the world. Currently, we've been looking forward to even greater cooperation with overseas customers based on mutual benefits. You should feel free to contact us for more details.